After-sales Service: | on Line /Locally |
---|---|
Warranty: | 24 Month |
Type: | Coating Production Line |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
CP-200505 |
||||
Outside Size(mm): | 20150×6500×5500mm(LxWxH) | |||
Inside Size(mm): | 20000×5000×5000 mm(L×W×H) | |||
Front Door(mm): | 4000×4500mm(WxH), 1 Unit,4 folded, galvanized steel cover frame, with polystyrene(EPS) inside | |||
Service Door(mm): | 2 units, 800×2000 mm (WXH), There are two sets of pressure lock which will automatically open when the pressure inside is over the limit. |
|||
Total Power: | 88.5KW | |||
Cabin System | Wallboard | Double construction with insulations EPS, thickness 75mm, 0.5mm steel thickness, width: 950mm, tongue and groove interlock structure, with Polystyrene(EPS) insulation inside. Profiled bar beams in the roof to strengthen the room body. |
||
Basement | Need to build the base construction, 2 rows of pits in the ground for exhaust air, dimension of each pit is 18000×760mm(L×W), with galvanized grids made by twisted steel and flat bar above. |
|||
Inlet Fan(Belt) | Capacity: 21000m³/h each | Outlet Fan(Belt) | Capacity: 36000m³/h each | |
Power: 7.5kw | Power: 11kw | |||
Quantity:8 sets | Quantity: 4 sets | |||
Purification System | G3 grade, Air Inlet pre filter, EU5/F5 high efficiency filter (ceiling filter), G3 grade glass fiber floor filter, exhaust active carbon filter. |
|||
Heating System | Italy Riello RG5S diesel burner, 260000Kcal/h, 4 sets | |||
Heating exchanger, stainless steel | ||||
max temp: 80 degree centigrade, heating time: 8-10 min(from 20 to 60)by Drying Phase | ||||
Lighting System | Ceiling Light: 26 Units, each 4×36W, with electronic ballasts; Side Light: 32 Units, each 4×36W, with electronic ballasts |
|||
Controlling System | Spraying, heat spraying, baking, time setting, lighting switch, failure indicator, thermostat, power supply switch, emergency stop, ampere meter, voltmeter, hour meter, temperature limit controller. |
|||
Environmental System | G3 grade glass fiber floor filter, exhaust active carbon filter. |
Suppliers with verified business licenses